TRACK RECORDS

POWER & ENERGY

 
ProjectYear
Jimah East Power (2 x 1000MW Coal Fired) – Generator Stator & Transformer2017/18
Jimah East Power (2 x 1000MW Coal Fired) – Upper and Lower Shells of Condensers2017/18
Jimah East Power (2 x 1000MW Coal Fired) – Deaerator & Boiler2017
Sungai Liang Hydro Plant 2017
Jimah East Power (2 x 1000MW Coal Fired)2016
IPP & TNB Manintenance Contract / OutagesOngoing
Heavy Transformers for TNB Substations / Contractors / Manufacturers in MalaysiaOngoing
Sarawak Samalaju Extension Substation2015
Manjung 5 Power Station (1000 MW Coal Fired)2014/15/16
Prai Power Station (1400 MW CCPP)2013/14/15
Tanjung Bin 4 Power Station (1000 MW Coal Fired)2013/14/15
Ulu Terengganu Hydro Power Station2013/14
Sarawak Lachu Substation2013
Manjung 4 Power Station (1000 MW Coal Fired)2011/12/13/14
Sarawak Samalaju Substation2011
Bakun Power Station (8 x 300 MW)2010
Jimah Power Station (1400 MW Coal Fired)8/7/2006
Tanjung Bin Power Station (2100 MW Coal Fired)2004/05/06/07
Cameron Highland Hydro Plant2006/2007
Gelugor Power Station2002
Prai Power Station (350 MW CCPP)2002
Panglima Power Station (720 MW CCPP)2001/02
TTPC-Perlis Power Plant (650 MW CCPP)2001/02
Malakoff – GB3 Power Plant (650 MW CCPP)2001/02
Janamanjung Power Station (2100 MW Coal Fired)2000/01/02/03
Tanjung Kidurong Power Station, Bintulu1998
MNI – Cogenerating Plant, Temerloh1998
Pahang Cement Cogenerating Plant1997
Sutra Harbour Power Station1997
Melaka Power Station1996
Paka Power Station1995/96
Kapar Power Station1995/96
Segari Power Station1995/96
Genting Sanyen Kuala Langat Power Station1995
Paka Power Station1994/95
Pasir Gudang Power Station1994/95
Pergau Hydro Electric Power Station1993/94
Kapar Power Station1993
Sungai Piah Hydro Electric Power Station1990
Connaught Bridge Power Station1989/90
Temengor / Tanah Merah Transmission Line1985
Batang Ai Hydro Electric Power Station1983/84
Paka Power Station1982/83/84/85
Temengor Hydro Electric Power Station1982
Genting Highlands Power Plant1981/82
  

OIL & GAS

 
ProjectYear
Rapid Package 7 (Technimont HQC)2017
Petronas Rapid Package 11 EO/EG2017
Petronas Rapid Samsung Package 6A & 112017
Petronas Rapid Package 5 (Steam Cracker Complex)2016
Lotte Titan Chemical TTP32017
Lotte Titan Chemical TE32016/17
Petronas Rapid Toyo2015/16/17
Chevron Gorgan Project2014
Petronas Rapid Deep Water Terminal2013
Balai Cluster / Anjung Kevil / Kayu Manis Loadout2013
Petronas SOGT2012
Chevron Gorgan Project2012
Shell Hijau, Port Dickson2011
Titan Butadiene & Propylene2007
Alcan Gove 3rd Stage Expansion G3 Project2006
Petronas MG32006
Petronas LNG32001
Petronas Olefin1999/2000
Petronas Putrajaya Gas District Cooling Plant1999
Petronas KLCC Gas District Cooling Plant1999
Petronas Ammonia Syngas1999
Petronas KLIA Gas District Cooling Facilities1998
Petronas Central Utility Facilities1998/99
Petronas KVCM1998/99
Petronas Aromatic1998/99
Petronas PSR-2, Teluk Rumania1998
Petronas Fertilizer Project, Gurun1998
Petronas GPP 5 & 61997/98
Shell – Sludge Catcher Centre, Sepangar Bay, Kota Kinabalu1997
Petronas GPP3, Kerteh1997
EPMI – Sludge Catcher Centre, Kerteh1996
Petronas PSR-2, Melaka1996
Petronas KLCC Gas District Cooling Facilities1996
Petronas Gas Pipe Line from Kerteh to Kemaman1994
Petronas MLNG2 M1 & M3 Loadout, Pasir Gudang1995
  

Project

Year

Glow Phase 5 Combined Cycle / Cogen Power Station, Thailand

2010

Shaquiq Power Station, Saudi Arabia

2009/10

Songkla Power Station, Thailand

2007

Muara Tawar Power Station, Indonesia

2004

Phu My Power Station, Vietnam (Major Outage)

2003/04/06

Amata Power Station, Thailand (Major Outage)

2003/04/06

Three Power Stations in Taiwan

2002

Guan Power Station, USA

1998

Paiton Power Station, Indonesia

1998

INFRASTRUCTURE

Project

Year

KVMRT – 4 units of TBM

2017/18

KTM Rehabilitation – Sungai Buloh to Serendah

2018

KTM – New Hopperwagons from Shanghai

2018

KVMRT – TBM & Escalators

2017

KVMRT – Train Coaches

2017

KTM Rehabilitation – Gemas to Tumpat, Kelantan

2016

KTM Klang Valley Double Track Project – Rawang to Salak South

2016

KVMRT – Train Coaches & Rails

2014/16

LRT Ampang Line Extension

2013

LRT Kelana Jaya Line Extension

2013

KVMRT – 10 units of TBM

2013/14

KTM Ipoh to Padang Besar Double Track

2008/12

YTL Padang Rengas Railway

2008

KTM Sentul to Batu Caves Double Track

2008

KTM Rehabilitation – Ipoh to Butterworth

2006

KTM Rawang to Ipoh Northern Double Track

2004

ERL Project

2000

Project

Year

Tuck Sin Link Bridge

2017

Pahang Selangor Water Transfer

2013/14

Penang Bridge Extension

2008

Teriang Water Transfer

2007

JPP Sewage Water Treatment Plant Phase 2: Package 2

2008/09

SMART Tunnel

2006/07

JPP Sewage Water Treatment Plant Phase 2: Package 3

2007

JPP Sewage Water Treatment Plant Phase 1: Package 1

2005/06

Inner Link Road Prai

2004/05

BR-8 Bridge Putrajaya

2001

Ampang-KL Elevated Highway

2000/01

Project

Year

49MW Solar Photovoltaic Plant

2018

World’s First Bio-based Manufacturing Plant

2018

CJ Bio Biochemical Plant

2017

GPS2 Plant Modification

2016

Kuantan Alliance Steel Plant

2016

Melaka XINYI Solar Plant

2016

YTL Strait Cement Plant

2013/14

YTL Perak Hanjoong – Water Heat Recovery

2013

YTL Perak Hanjoong

2013

Vale Malaysia Minerals Plant

2013

Bahau Cement Plant

2012/13

Bintulu Tokuyama Plant

2012

Mewah Oil Plant (Relocation)

2004

PT Domba Mas, Ole Chemical Plant

2004

Lafarge Grinding Mills Plant (Relocation)

2004

Gebeng, Mieco Chipboard Plant

2004

Mentakab Malaysian Newsprint Industries Plant